come (or go) back
Shanghai ITW Phase I 3MWp Photovoltaic Project
Congratulations to Shanghai ITW's Phase I 3MWp PV project which was successfully connected to the grid on January 19, 2024!
The project has a total installed capacity of 3MWp, with an average annual power generation of 3,006,000 KWh, which can reduce the average annual carbon emissions by 992 tons. The project adopts the FM-certified steel roof S5 photovoltaic system, which, as an important part of the green development of Shanghai EGM, demonstrates the perfect combination of sustainable energy and environmental protection.
During the construction of the project, we were responsible for a full range of work from infrastructure construction to equipment installation, performing all tasks in strict accordance with industry standards to ensure the high quality and efficiency of the project. In the construction management of the project, we optimized the allocation of resources and reasonably arranged the construction cycle to ensure the smooth progress of the project, and successfully overcame all kinds of technical and environmental challenges to provide a strong guarantee for the timely connection of the project to the grid.
Special thanks to Shanghai ITW Plastic Hardware Co., Ltd. for its strong support and trust in the whole project process, the close cooperation between the two sides has laid a solid foundation for the successful completion of the project, we look forward to continue to work hand in hand with Shanghai ITW in the future, and jointly promote more green energy projects.
Shanghai ITW Plastic Hardware Co., Ltd. is a member of ITW Group, founded in 1995, specializing in the production of plastic parts and fasteners for the automotive industry, and its products are widely sold in Europe, America and Southeast Asia markets.